The purchaser commissioned the organization of competitive negotiations on the procurement of police motorcycles and police electric patrol vehicles (secondary) for the Police Substation of the High-tech Zone Public Security Bureau. According to the provisions of relevant laws and regulations of the "PRC Government Procurement Law," it shall be publicly transparent. The principle of fair competition, fairness and honesty and credit is to welcome suppliers with relevant qualifications and compliance capabilities to participate in competitive negotiations.
I. Project Name: Procurement Project for Police Motorcycles and Police Electric Patrol Vehicles in the High-tech Zone Public Security Bureau (Secondary)
Item No.: Yun Tongli Purchasing Word [2017] No. 010
Third, procurement methods: competitive negotiations
IV. List of procurement items:
No. Equipment Name Specification or Detailed Performance Requirements Quantity Purchase Budget (yuan) Availability
(Including the installation period) Place of delivery 1 Two rounds of police motorcycles Motorcycles.00 30 calendar Tianyuxi City Public Security Bureau High-tech Industrial Development Division designated place 2 Five battery electric patrol cars 2
V. Supplier qualification requirements:
5.1 In compliance with the provisions of Article 22 of the "People's Republic of China Government Procurement Law";
5.2. A legal company registered in China and having an independent legal personality has the ability to independently bear civil liabilities (has a valid business license, organization code certificate, tax registration certificate or business license with a triple certificate);
5.3 Negotiation of the supplier's business scope shall have the right to produce, sell or operate the relevant goods;
5.4 The manufacturer of the product issued the original power of attorney for the project or the distribution contract or agency certificate (including motorcycles, electric vehicles, and the manufacturer does not need to provide this item);
5.5 This negotiation does not accept the Consortium's talks.
6. Time, place and method for obtaining negotiation documents:
6.1 Time for Negotiation Documents: From February 16, 2017 to February 20, 2017, the date of this announcement will be from 8:00 a.m. to 11:30 a.m. and 2:30 p.m. to 5:30 p.m. (Excluding legal holidays and weekends)
Battery Cable
Over time, battery cables have to be replaced due to corrosion or damage. A bad battery cable can cause intermittent starting issues or lack of power to the vehicle, including arcing or power drains.A battery cable consists of multiple stands of wire encased in synthetic material with different types of battery terminals on each end for a reliable connection. Corrosion is the number one cause of battery cable failure, stopping the flow of electricity.
Battery cable, power cable, battery cable assembly, battery wiring
ETOP WIREHARNESS LIMITED , https://www.oemwireharness.com