Jiangdong Bridge East Connection Phase I Lighting Project (Second) Tender Notice

Jiangdong Bridge East Connection Phase I Lighting Project (Secondary) Tender Notice Industry Classification Lighting Bidding

Details 1. The street lighting project of Huangshan Middle Road (middle section), Huangshan West Road (middle section) and Bailongshan South Road (east section) of Zhenjiang Urban Road Construction Project has been approved by Zhenjiang Development Planning Committee. The source of funding for the project is that government investment has now been implemented. A qualified potential bidder is invited to participate in the bidding of the project.
2. Entrusted by the tenderee to be specifically responsible for the tendering of the project.
3. Project Overview:
(1) Project Location: Huangshan Middle Road (middle section), Huangshan West Road (middle section), Bailongshan South Road (East Section) Type of tender: Construction tender area: Municipal jurisdiction
(2) Project scale: Huangshan West Road (middle section) has a total length of 660 meters and a road width of 24 meters. The street lamp is set at 38 miles and the box is changed to one.
Building area: square meter Engineering nature: Municipal engineering tender amount: 10,000 yuan
(3) Planned opening and completion time: 2008-11-20 to 2008-12-20
4. The bidding project is divided into 2 bidding sections. The bidding sections and corresponding bidding contents are as follows:
Huangshan Middle Road (middle section), Huangshan West Road (middle section)
Installation of 10KV street light transformers in construction drawings, construction of high-voltage parts, laying of underground pipelines along line lights and installation of street lamps, and related subsidiary projects Bailongshan South Road (East Section)
10KV street lamp transformer installation, high-pressure part construction, underground line laying along the line lamp and street lamp installation in the construction drawings, and related sub-project enterprises are allowed to apply for the number of bids: 2 The number of bids allowed by the project manager: 2
5. The main qualifications that applicants should have:
(1) Applicant qualification category and level:
(2) The qualification level of the project manager to be selected:
(3) Enterprise performance and reputation:
(4) Project manager's performance and reputation:
(5) Other conditions: (1) Applicant qualification category and grade: urban and road lighting engineering professional contractor level and above or mechanical and electrical equipment installation engineering professional contractor level and above or mechanical and electrical installation engineering construction general contracting level and above qualifications .
(2) The qualification of the project manager to be selected: the qualification of the construction engineer (level of municipal public works or mechanical and electrical engineering), and the original certificate of safety production assessment certificate. The registered architect shall provide the original certificate of practice registration certificate or the original certificate of the registered construction engineer's certificate issued in accordance with Su Jian Guan Enterprise (2008) No. 19.
(3) Other conditions:
1. Have the ability to independently conclude a contract;
2. Not being ordered to suspend business, the bidding qualification is cancelled, or the property is taken over, frozen and bankrupt;
3. The company has not been suspended by the relevant departments for the bidding or serious breach of contract and major engineering quality and safety production accidents, and is in the suspension period;
4. In the case of applying for pre-qualification in the form of a consortium, the qualifications (qualifications) of each consortium must meet the requirements at the same time, and a joint bidding agreement is attached;
5. The important contents of the pre-qualification application are not inaccurate or fraudulent;
6. The company has safe production conditions and obtained a safe production license;
7. The project manager of the project has no construction in progress, or although there are projects under construction, all the construction tasks within the scope of the contract are nearing the completion stage, and the application for completion acceptance has been submitted to the contractor, and the original contractor agrees to participate in other projects. Bidding competition for the project;
8. The owner has the right to reject bidders whose performance, poor reputation and bad behavior in previous projects;
9. The construction enterprise registered in this Municipality shall provide the wage guarantee certificate (original) of the migrant workers that has been paid, and the construction enterprise that has not registered in this city shall receive the notice of winning the bid with the payment of the wage guarantee certificate of the migrant workers.
10. Compliance with other conditions stipulated by laws and regulations.
6. Access to the bidding qualification (tender) document method:
File Type: Pre-qualification documents for pre-qualification documents:
Get file start date: 2008-10-20 Get file deadline 2008-10-24
Morning time: 09:00 Morning time 12:00 pm Time: 14:00 18:00 18:00
Where to get the file: 7th Floor, Huaxing Building, Zhongshan East Road, City
7. Applicants should apply to the Zhenjiang Construction Engineering Trading Center from 08:00 am to 18:00 pm (excluding public holidays and holidays) from 2008-10-20 to 2008-10-24.
The time for submitting the pre-audit materials: In the morning, the tender box number of the pre-trial materials will be submitted in the afternoon: (tentative, pay attention to the big screen on the day)
8. Others: Applicants should apply to the Zhenjiang Construction Engineering Trading Center before 18:00 on October 24, 2008. The registration applicant must bring a written application with the official seal and the construction project manager of Zhenjiang City. The market management information card (ie IC card) participates in the registration, and has not obtained the foreign construction unit of the Jiangsu Province Construction Enterprise Credit Manual in Zhenjiang District. After the assessment by the owner, the invitation letter from the owner and the Zhenjiang Construction Bureau will go through the formalities for the individual entry into the town to participate in the registration. And to obtain the pre-qualification documents on the 7th floor of No. 45 Zhongshan East Road.
9. All bidders who have passed the pre-qualification qualification shall participate in the bidding (not less than 3).
10. Bidders who are qualified for pre-qualification shall pay the bid bond in accordance with the provisions of Zhenzhengjian (2008) No. 55.

11. Address of the tenderer: Zhenjiang City Urban Road Construction Office Contact: Zhang Shaohua Tel: 13101926521
12. Tendering Agency: 7th Floor, Huaxing Building, Zhongshan East Road, City Contact: Xu Haitao Tel: 0511-85081339

SC/APC Fiber Optic Fast Connector

Sc/Apc Fiber Optic Fast Connector,Fiber Optic Adaptor Fast Connector,Fiber Quick Connect Kit,Sc Fiber Optic Fast Connector

Ningbo Fengwei Communication Technology Co., Ltd , https://www.fengweifiberoptic.com